[2016-Mar. -NEW]2016 Cisco CCNP Wireless 642-732 CUWSS Exam Questions & 642-732 CUWSS Dumps From Braindump2go

2016 NEW Cisco CCNP Wireless 642-732 CUWSS Exam Questions Updated Today!

Introduction:
The Conducting Cisco Unified Wireless Site Survey (CUWSS) 642-732 exam is a 75-minute test with 45−65 questions that are associated with the Cisco CCNP Wireless certification. This exam assesses a candidate’s ability to plan and conduct a wireless site survey, design the RF network, and conduct a post installation assessment to ensure compliance.

2016 NEW 642-732 CUWSS Study Guides:
1. Prepare for the Site Survey
2. Plan for the Site Survey
3. Conduct the Site Survey
4. Design the RF Network
5. Conduct Post-Deployment Assessment

QUESTION 168
What is the attenuation of a wireless signal that passes through a cider block wall?

A.    3 dB
B.    4 dB
C.    6 dB
D.    12 dB

Answer: B

QUESTION 169
After installation of a new data-only wireless network, an engineer found that RRM has set all of the APs to a power level of 1. Which option describes the reason for this?

A.    APs are too far apart for the set data rates.
B.    EDRRM is enabled.
C.    APs should be manually set initially.
D.    TPC needs to be enabled.
E.    DTPC value is set too high.
F.    High co-channel interference exists.

Answer: A

QUESTION 170
Which three post-installation checks should an engineer perform after a new wireless installation? (Choose three.)

A.    Check for co-channel interference.
B.    Check for adequate signal levels as surveyed.
C.    Conduct a passive survey of 802.11a and 802.11b.
D.    Conduct a passive and active survey of each media type in use.
E.    Verify that the minimum data rate is 24 Mbps.
F.    Verify that the cell overlap is 20%.

Answer: ABD

QUESTION 171
An engineer is preparing to conduct a site survey with AirMagnet. The engineer wants to capture all 802.11 traffic (not SSID specific) on the first walkthrough. Which survey mode should be used?

A.    active
B.    active with Iperf for greenfield: AP mode
C.    active with Iperf for greenfield: SSID mode
D.    passive
E.    planning mode survey

Answer: D

QUESTION 172
An engineer is conducting a site survey for use of Cisco 7925 wireless clients. Which two design criteria are necessary to ensure proper network design? (Choose two.)

A.    15 percent overlap
B.    20 percent overlap
C.    25 percent overlap
D.    -65 dBm RSSI or better
E.    -67 dBm RSSI or better
F.    -72 dBm RSSI or better

Answer: BE

QUESTION 173
An engineer is tasked with designing a WLAN. The customer is prioritizing data speeds to the desktop, but is also entertaining the idea of adding 802.11 phones in the future. Given this information, how should the engineer conduct the survey?

A.    consider the employee head count in congested office space and limit the edge of each cell to an RSSI of -67mW
B.    restrict AP cell edges to -67dB and be sure to strategically place APs in congested office spaces
C.    co-locate access points when possible to cover high user areas and place APs at each corner of the facility
D.    stagger the AP placements, and be sure to have a high signal to noise ratio that will accommodate the future VoIP devices

Answer: B

QUESTION 174
An engineer is installing a wireless network in an industrial area with extreme temperatures and a significant amount of dust. Which enclosure should be used to protect the APs?

A.    NEMA
B.    ACU
C.    WLSE
D.    ADU

Answer: A

QUESTION 175
In an outdoor mesh environment, which is the purpose of deploying one of the access points relatively higher than the others?

A.    The MAPs need to be mounted higher than the first hop RAPs so that the mesh units can accomplish radio line of sight.
B.    Elevated MAPs are connected to the switches, providing better bandwidth that all the RAPs utilize for client connectivity.
C.    An AP deployed as a RAP needs to be mounted in a higher elevation to provide clear connectivity to first hop MAPs.
D.    Root APs need clear line of sight to provide the best bandwidth to all of its RAPs, so the higher the better.

Answer: C

QUESTION 176
A site survey proposes placement of new APs to replace older APs. Which three options are three potential placements of the new APs? (Choose three.)

A.    Use the old placements where they are near the proposed location.
B.    Add APs from the site survey that have no APs in older installation.
C.    Mount new APs on the exact location according to site survey report.
D.    Use network cables and mounting brackets from the older installation.
E.    Deploy APs every 4000 square feet.
F.    Deploy APs every 3000 square feet.

Answer: ABC

QUESTION 177
A company has requested an indoor wireless survey that supports 5GHz radio, 3×4 MIMO technology, and 3 spatial streams. Which AP is used to perform this survey?

A.    600
B.    1242
C.    1600
D.    2600
E.    3600

Answer: D

QUESTION 178
An engineer is configuring an AP for a site survey. How should the transmit power be configured?

A.    Set to maximum power.
B.    Set to one level below full power.
C.    Enable DTPC.
D.    Set to one level above the lowest power level.

Answer: B


2016 NEW Cisco CCNP Wireless 642-732 CUWSS PDF & 642-732 CUWSS VCE 197Q Full Version from Braindump2go:http://www.braindump2go.com/642-732.html

         

Categories 642-732 Dumps/642-732 Exam Questions/642-732 PDF/642-732 VCE/Cisco Exam

Post Author: mavis

Categories

Archives

Cisco Exam Dumps Download

200-301 PDF and VCE Dumps

200-901 PDF and VCE Dumps

350-901 PDF and VCE Dumps

300-910 PDF and VCE Dumps

300-915 PDF and VCE Dumps

300-920 PDF and VCE Dumps

350-401 PDF and VCE Dumps

300-410 PDF and VCE Dumps

300-415 PDF and VCE Dumps

300-420 PDF and VCE Dumps

300-425 PDF and VCE Dumps

300-430 PDF and VCE Dumps

300-435 PDF and VCE Dumps

350-401 PDF and VCE Dumps

350-401 PDF and VCE Dumps

350-801 PDF and VCE Dumps

300-810 PDF and VCE Dumps

300-815 PDF and VCE Dumps

300-820 PDF and VCE Dumps

300-835 PDF and VCE Dumps

350-801 PDF and VCE Dumps

200-201 PDF and VCE Dumps

350-601 PDF and VCE Dumps

300-610 PDF and VCE Dumps

300-615 PDF and VCE Dumps

300-620 PDF and VCE Dumps

300-625 PDF and VCE Dumps

300-635 PDF and VCE Dumps

600-660 PDF and VCE Dumps

350-601 PDF and VCE Dumps

352-001 PDF and VCE Dumps

350-701 PDF and VCE Dumps

300-710 PDF and VCE Dumps

300-715 PDF and VCE Dumps

300-720 PDF and VCE Dumps

300-725 PDF and VCE Dumps

300-730 PDF and VCE Dumps

300-735 PDF and VCE Dumps

350-701 PDF and VCE Dumps

350-501 PDF and VCE Dumps

300-510 PDF and VCE Dumps

300-515 PDF and VCE Dumps

300-535 PDF and VCE Dumps

350-501 PDF and VCE Dumps

010-151 PDF and VCE Dumps

100-490 PDF and VCE Dumps

810-440 PDF and VCE Dumps

820-445 PDF and VCE Dumps

840-450 PDF and VCE Dumps

820-605 PDF and VCE Dumps

700-805 PDF and VCE Dumps

700-070 PDF and VCE Dumps

600-455 PDF and VCE Dumps

600-460 PDF and VCE Dumps

500-173 PDF and VCE Dumps

500-174 PDF and VCE Dumps

200-401 PDF and VCE Dumps

644-906 PDF and VCE Dumps

600-211 PDF and VCE Dumps

600-212 PDF and VCE Dumps

600-210 PDF and VCE Dumps

600-212 PDF and VCE Dumps

700-680 PDF and VCE Dumps

500-275 PDF and VCE Dumps

500-285 PDF and VCE Dumps

600-455 PDF and VCE Dumps

600-460 PDF and VCE Dumps

Microsoft Exams Will Be Retired

AZ-103(retiring August 31, 2020)

AZ-203(retiring August 31, 2020)

AZ-300(retiring August 31, 2020)

AZ-301(retiring August 31, 2020)

77-419(retiring June 30, 2020)

70-333(retiring January 31, 2021)

70-334(retiring January 31, 2021)

70-339(retiring January 31, 2021)

70-345(retiring January 31, 2021)

70-357(retiring January 31, 2021)

70-410(retiring January 31, 2021)

70-411(retiring January 31, 2021)

70-412(retiring January 31, 2021)

70-413(retiring January 31, 2021)

70-414(retiring January 31, 2021)

70-417(retiring January 31, 2021)

70-461(retiring January 31, 2021)

70-462(retiring January 31, 2021)

70-463(retiring January 31, 2021)

70-464(retiring January 31, 2021)

70-465(retiring January 31, 2021)

70-466(retiring January 31, 2021)

70-467(retiring January 31, 2021)

70-480(retiring January 31, 2021)

70-483(retiring January 31, 2021)

70-486(retiring January 31, 2021)

70-487(retiring January 31, 2021)

70-537(retiring January 31, 2021)

70-705(retiring January 31, 2021)

70-740(retiring January 31, 2021)

70-741(retiring January 31, 2021)

70-742(retiring January 31, 2021)

70-743(retiring January 31, 2021)

70-744(retiring January 31, 2021)

70-745(retiring January 31, 2021)

70-761(retiring January 31, 2021)

70-762(retiring January 31, 2021)

70-764(retiring January 31, 2021)

70-765(retiring January 31, 2021)

70-767(retiring January 31, 2021)

70-768(retiring January 31, 2021)

70-777(retiring January 31, 2021)

70-778(retiring January 31, 2021)

70-779(retiring January 31, 2021)

MB2-716(retiring January 31, 2021)

MB6-894(retiring January 31, 2021)

MB6-897(retiring January 31, 2021)

MB6-898(retiring January 31, 2021)